Control Panels for Building Management Solutions - Honeywell UK

The Challenge
To develop a robust design and build programme

The key challenges associated with the delivery of the project were:

  • Agreeing a robust design and build programme
  • Creating designs in parallel with evolving requirements from the end customer
  • Identifying and scheduling long lead-time items procurement to ensure the parts were available for production when required


The Solution

Cross-business project team alongside expert design & manufacture

Bensons worked closely with the Honeywell team to align on requirements before creating schematic designs for the AstraZeneca project


The Result

Pre-delivery inspection process - positive feedback throughout

The suite of panels was delivered in line with the pre-agreed plan, in some instances the build schedule was adjusted to align with changing requirements from the end customer.