CASE STUDY



                                                                                                C ONTR OL  P ANELS





               The Solution
               Experienced engineers, fully engaged in a collaborative
               and parallel working approach
               for a timely result.
               Building on a strong working relationship established on
               previous projects, Bensons was quickly able to evaluate
               the requirements and pull together a proposal to build
               the control panel in line with the project timescales.
               A control panel handover date of Christmas was agreed,
               another immoveable date which no-one at Bensons
               wanted to miss, in order to support their customer to
               secure the project. Immediately following approval of the
               project, Bensons was able to commence the
               procurement of components necessary to start the build
               of the control panel in line with the agreed plan.
               A kick-off meeting was held between the EES project
               team and the Bensons team who would be building the
               control panel, to ensure that requirements were clear
               and any questions resolved quickly and effectively.
               Due to the design of the control panel, Bensons was able
               to fully utilise our sizeable and highly skilled workforce to
               have several, experienced engineers working
               productively on the panel together. This parallel working
               approach saved significant amounts of end to end
               production time
               Regular reviews throughout the build were carried out.
               By adopting a collaborative approach between EES and
               Bensons, it was possible to quickly resolve any issues
               encountered during manufacture and test.
               Bensons was then able to make our customer acceptance
               area available to EES, initially for their own extensive
               schedule of internal testing and subsequently for a
               successful Factory Acceptance Test with the end client.







               The Result
               A control panel achieving ABS Certification for deployment offshore.

               Bensons was able to respond quickly to the opportunity presented by EES, as part of this we were
               able to commit to achieving aggressive timescales on a strategically important project for EES.
               The control panel was built, tested and available to EES to commence their software integration and
               testing ahead of the Christmas handover milestone.
               The control panel achieved American Bureau of Shipping (ABS) certification, this was a first for EES
               and for Bensons. The finished and tested control panel was handed over to the end customer on time,
               allowing it to be initially installed on a Floating Production Storage and Offloading (FPSO) vessel in
               the Middle East, prior to deployment on an oil field off the coast of Brazil for at least 15 years.