Page 18 - Bensons Panels - Case Studies
P. 18

CASE STUDY



                                                                                         C ONTR OL  P ANELS
                                    Basingstoke
                                    Aquadrome



        The Solution
        Exploiting our in depth knowledge of Total Leisure
        Engineering requirements, using trusted supply chain
        partners to ensure a fast tracked solution.

        Recognising the importance of this project to
        Basingstoke Council and to Total Leisure Engineering,
        Bensons was able to fast track the project from a
        perspective of developing a fully costed proposal
        that aligned with the project requirements. Once
        instructed, Bensons was able to exploit our
        understanding of Total Leisure Engineering
        requirements to quickly create a set of designs that
        would full-fill the design brief, taking account of the
        electrical requirements of the system and the physical
        space constraints.
        Once the design was approved, Bensons was able to
        use its spacious factory together with its large and
        highly experienced workforce to build and test the
        full 7.2m wide control panel in one piece. By working
        with our trusted supply chain partners, Bensons was
        able to propose Invertek as a suitable second source
        of Variable Speed Drives for the project. Whilst
        Bensons had manufactured control panels featuring
        these drives, they had not been used by Total Leisure
        Enginering before. To avoid the risk of Total Leisure
        Engineering engineers running into problems on-site
        in Basingstoke during commissioning, Bensons was
        able to arrange for Invertek technical support to be
        available during the testing phase at Bensons to
        ensure that the drives could be configured correctly.
        Once the features panel was fully tested, it was split
        into seven parts and delivered to site in Basingstoke,
        where upon it was reconnected and all connections
        retested.





        The Result

        Through close collaboration between Total Leisure
        Engineering and Bensons, it was possible to secure
        and deliver a substantial project to tight timescales.
        Enabling the upgrade of the Basingstoke Aquadrome
        to be complete in a timely manner.








              01924 894162           hello@bensonspanels.co.uk
          Beckbridge Road, Normanton Ind Est, Normanton, West Yorkshire. WF6 1QS